13 ft x 10 ft S-Curved Wave Magnetic Modular Fabric Display Image - 1
Magnetic Modular Fabric Display Bestseller

13 ft x 10 ft S-Curved Wave Magnetic Modular Fabric Display

10 viewing now
SKU: A2ZMG011
Rated 0.0 out of 50 reviews Product Specification
Need it fast? Select Express Shipping at checkout
How we protect your artwork
Free proofWe send a digital proof You approveNothing prints before that We printOr reprint free if wrong
100% reprint guaranteeDamaged or off proof, we reprint it free.Design guidelinesPDFPhotoshopIllustratorInDesign

Configure your booth

Add them once, use them at every show

Show day essentialsSave 10%

How fast do you need it

Delivery speed

Ground Shipping is free when the subtotal is $499 or more.

Configured totalYou save $663.11 (26%)Ground Shipping
$2,550.42$1,887.31
Secure Checkout
Product description

13 ft x 10 ft S-Curved Wave Magnetic Modular Fabric Display. 240g flame-retardant tension fabric, dye sublimation, double-sided. Tool-free magnetic…

Package includes

10 parts
Tension fabric backwall graphicQty 1
Single-sided, double available

210 to 230 GSM dye-sublimated polyester, full 10 ft flat face.

32mm aluminum tube frameQty 1
Tool-free assembly

1.1mm wall tubes, tool-free assembly in 15 to 25 min.

Snap-button spigot connectorsQty set
Standardized fit

Push-fit joints click tubes together at every junction.

Stabilizing feetQty set
Included

Keeps the backwall upright and level on any floor.

Connecting clipsQty set
Included

Align and lock panels across the frame.

Steel TV bracketQty 1
Fits 13 to 30 in monitors

Fixed-height VESA mount for attendee video demos.

Podium with wheeled carry caseQty 1
Double-sided print

37 in W x 40 in H x 17.5 in D, doubles as transport case.

Podium interior shelfQty 1
Included

Internal shelf for stock, devices, or lead forms.

Zipper pillowcase coversQty 1
Included

Fabric sleeve zips around the frame, no hardware shows.

Carry bagsQty set
Included

Padded bags for frame tubes and accessories.

Included at no extra costWorth $275
Expert design help$60 Padded carry bags$45 Priority production review$75 Nationwide delivery$95
Total value included$275

Six steps from click to delivered booth

How to order
Step 1
Select your product
Step 2
Choose size, options and delivery
Step 3
Checkout and pay
Step 4
Upload artwork or request design help
Step 5
Approve your email proof
Step 6
We print and ship to your door
13 ft x 10 ft S-Curved Wave Magnetic Modular Fabric DisplayGround Shipping SecureCheckout $2,550.42$1,887.31 Add to cart

Specifications

The 13 ft x 10 ft S-Curved Wave Magnetic Modular Fabric Display runs on a 32mm magnetic aluminum frame with 240g flame-retardant tension fabric printed double-sided by dye sublimation. It's built for mid-size booth assignments at trade shows and convention centers where a flat backwall doesn't hold the aisle. Both faces carry full-color graphics so the display works in open floor plans.

Material
Flame-retardant 240g tension fabric (tightly woven polyester rated to resist ignition).Meets most convention center fire codes without a separate treatment step before the show.
Print Method
Dye sublimation.Ink absorbs into the fabric fibers, so graphics won't crack, peel, or fade after repeated show cycles.
Color Output
Full-color, front and back.Your brand reads clearly from both approach angles across the full 13 ft span.
Finishing
Pillowcase-style fabric sleeve.The sleeve zips around the frame like a fitted cover, hiding all hardware with no visible connectors.
Size
13 ft wide by 10 ft tall.Sized for mid-size booth assignments that need more presence than a standard 10 ft backwall.
Indoor/Outdoor Rating
Indoor use at trade shows and convention centers.The flame-retardant fabric meets typical venue fire codes across repeated show cycles.
Single/Double-Sided
Double-sided.Front and back each carry your full design, suited for open floor plans and island-adjacent placements.
Frame
32mm diameter aluminum tubes at 1.1mm wall thickness with magnetic joints. Lifetime hardware warranty included.
Download the full spec sheetPDF with every dimension, material, and setup note, ready to share internally.

Features

Key highlights

  • S-Curved Wave Shape Across a 13 ft Magnetic Aluminum Frame
  • 240g Flame-Retardant Tension Fabric Printed Double-Sided
  • Tool-Free Magnetic Sections That Lock the Curve Without Braces

S-Curved Wave Shape Across a 13 ft Magnetic Aluminum Frame

The serpentine silhouette runs the full 13 ft span on a 32mm aluminum frame with 1.1mm wall thickness. Most flat backwalls at this width blend into the row behind neighboring displays. The S-curve pushes your booth's footprint into the aisle sight line, so attendees see the wave shape from 40 ft away before they read a single word. Smooth curves. Real movement. The magnetic aluminum frame holds the full S-curve without braces or crossbars, so the serpentine silhouette stays true from the moment you lock the last section.

240g Flame-Retardant Tension Fabric Printed Double-Sided

Flame-retardant 240g tension fabric (a tightly woven polyester rated to resist ignition) wraps the frame front and back. Dye sublimation ink heats into a gas and absorbs directly into the fabric fibers, which means the image won't crack, peel, or fade the way surface-printed vinyl does. Colors stay sharp and the double curve pulls smooth with no sagging or bunching across the full 13 ft span. And because the fabric meets most convention center fire codes, you don't need a separate treatment step before show day.

Tool-Free Magnetic Sections That Lock the Curve Without Braces

Magnetic joints align and lock at each connection point without tools or loose hardware. Here's the thing: two people can assemble the full 13 ft S-shape in minutes and break it down just as fast at the end of the show. No crossbars, no braces, no stray connectors to hunt for in a carry case at 7 a.m. A2Z Printing Hub backs the aluminum frame and magnetic joints with a lifetime hardware warranty.

Customer reviews

0.0
★★★★★
Based on 0 reviews
No customer reviews yet.

Ideal for

Mid-size inline booth assignments at industry expos where a 13 ft span carries a full brand story across the wave without crowding side walls.
Technology and software companies at conferences like CES or NAB where the serpentine silhouette signals movement from 40 ft down the aisle.
Pharmaceutical and medical brands at HIMSS where the curved, open shape reads as approachable rather than rigid.
Marketing teams rotating through 3 to 5 shows per year who need a backwall that sets up fast and holds its shape show after show.
Product launch events inside convention centers where the S-curve creates a natural focal point behind a demo table without needing a corner assignment.
Corporate conference exhibitors whose booth sits in an open floor plan visible from two approach angles and needs double-sided graphics.
Recruitment and job fair teams who want a backwall that draws candidates toward the table from across the hall.
Startup founders at demo-day events who want a backwall that reads as bold and considered rather than a flat vinyl print on a pop-up frame.

Not the best fit for

Buyers who need a built-in podium, TV stand, or counter should look at Modular Trade Show Booths. That line includes those accessories in the configuration.

First-time exhibitors who want the simplest flat backwall with no curve complexity will find a better fit in Inline Trade Show Booths.

Buyers with tighter budgets who need a single-panel display at the lowest entry cost should start with Affordable Trade Show Booths before stepping up to this size.

How to choose

Use these buying points to choose the right 13 ft x 10 ft S-Curved Wave Magnetic Modular Fabric Display configuration.

  1. Backwall Shape Decides Whether Your Booth Gets Noticed

    Flat inline backwalls max out your printable wall space, which suits dense text layouts or product grids. But a flat wall in a row of flat walls reads as background. The S-curve carries visual movement across the full 13 ft span, so attendees pick it out from roughly 40 ft down the aisle before they read a single word.

    A single-curve arch sits between the two. It adds presence but does not carry the same lateral energy across a wider span. The short answer: go with the S-curve when your booth sits mid-row and needs to stop traffic on its own. Go flat only when your graphics are text-heavy and wall coverage matters more than silhouette.

  2. Your Assigned Span Determines the Right Frame Width

    A standard 10 ft backwall leaves gaps on each side of a wider assignment. This display runs 13 ft wide, sized for mid-size inline assignments that a 10 ft frame does not fully cover. If your assigned space runs past 13 ft, step up to the 16.4 ft version in the same magnetic wave family. That frame uses the same magnetic joint system and 240g tension fabric, so graphic replacement transfers across sizes without relearning the setup.

  3. Print Sides Depend on How Attendees Approach Your Booth

  4. Back Wall Flush Against a Hard Surface

    Single-sided works here. No one reaches the back face, so double-sided printing adds cost with no return.

  5. Open Floor Plan or Peninsula Placement

    Double-sided is the right call. Attendees approach from behind or from the side in open floor plans and peninsula assignments, and a blank rear face reads as unfinished from 20 ft away. This display prints double-sided by default, so both curves carry your full brand from every approach angle.

  6. Accessories the Backwall Alone Does Not Cover

    This display ships as a backwall kit. It does not include a demo table, branded counter, or aisle-entry signage. Add a Table Cover in the same dye sublimation process so your demo table matches the backwall fabric. For aisle-entry reach beyond the 13 ft span, a Retractable Banner Stand on each side extends your footprint without a larger frame.

Pair it with

Tie the Demo Table to the Backwall

Your S-curve carries bold dye sublimation fabric across 13 ft. A bare folding table in front breaks that branded surface. A Table Cover printed in the same dye sublimation process closes the gap so the full booth reads as one surface from the aisle entry to the back wall.

Extend Your Reach Beyond the 13 ft Frame

The backwall commands the rear of your space. But attendees walking the aisle need a reason to slow down before they reach you. Retractable Banner Stands placed at each end of the S-curve give you that pull, and Custom Flags at the aisle corner mark your location from well down the row.

Step Up or Down in the Same Magnetic Family

The magnetic frame system and 240g tension fabric run consistent across the wave line. The 10x10 S-Curved Wave suits a standard single-booth assignment. The 16.4x10 version covers a wider mid-size floor plan without switching systems.

Different Booth Structures for Different Needs

A flat backwall with maximum text space fits some jobs better than a wave shape. Inline Trade Show Booths cover that need. For demo-heavy setups that need a built-in podium or TV stand alongside the backwall, Modular Trade Show Booths include those accessories in the configuration.

FAQs

Will the S-Curve Hold Its Shape Once the Fabric Stretches Over the Full Magnetic Frame?

Yes, and this is the question most buyers have before they order. The magnetic aluminum frame locks the serpentine form at each joint. 240g tension fabric (a tightly woven polyester rated heavier than typical 210g display fabric) pulls both curves taut without braces or crossbars. The shape stays put under fabric tension because magnetic joints hold alignment at every connection point across the 13 ft span.

How Long Does Assembly Take on a Busy Show Morning?

Two people can lock the full S-shape in minutes. Magnetic joints align and click at each section without tools or loose hardware to track, so there's no searching for screws or connectors at 7 a.m. on setup day. Breaking it back down at the end of the show runs just as fast.

Can I Replace the Fabric Graphics Between Shows Without Buying a New Frame?

Yes. The aluminum frame carries a lifetime hardware warranty and stays in service show after show. Order replacement fabric panels when your graphics need updating or when you're running a different campaign. The pillowcase-style sleeve (a fabric cover that zips around the frame) removes and re-attaches without tools, so a new fabric set goes on in the same session as teardown.

Does the 240g Tension Fabric Meet Convention Center Fire Codes Without a Separate Treatment?

It does. The fabric is flame-retardant as manufactured, which means it's rated to resist ignition without a separate spray treatment applied on-site. Most convention centers accept this rating as-is, but we recommend confirming the specific venue's code before your show if you're exhibiting at a facility with stricter requirements.

What Happens If a Magnetic Joint or Frame Section Gets Damaged at the Show?

Contact us immediately. The lifetime hardware warranty on the aluminum frame and magnetic joints covers manufacturing defects. If a joint fails at the show due to a defect on our end, we make it right. For physical damage from shipping or handling, spare sections are available separately so you're not replacing the full kit over a single damaged tube.

Get your artwork right

Accepted file formats are PDF, PNG, JPG, and AI. Vector AI files are the right call for any logo or icon so edges stay crisp at 13 ft wide.

We accept PDF PNG JPG AI
Resolution
minimum 150 DPI at final output size. Recommended 300 DPI for any panel section under 4 ft wide, because that's where attendees get close enough to catch a soft edge.
Bleed
0.25 in on all sides. This lets us trim without clipping your design at a seam.
Safe zone
keep all critical text and logos at least 0.5 in from each edge so nothing important falls near a bend point on the S-curve.
Color mode
CMYK. RGB files convert on our end, but color shift is possible. Supply CMYK originals for the most accurate match between your screen and the printed fabric.

Supply front and back artwork as separate files. Account for the S-curve panel layout so seams and edges land at the correct bend points on each wave section. And don't estimate the panel breaks: download our template before you start laying out art.

A free online design tool is available at checkout. Full-service design help is also available if you need a layout built from scratch. Submit your booth panel artwork as print-ready files and our team sends you a free digital proof showing every graphic in position.

Shipping and delivery

How to Order

  1. Upload your front and back artwork files for each panel. Our team checks every file and sends a free digital proof showing exactly how your graphics sit on the S-curve shape.
  2. Approve the proof. Once you confirm, production starts within 1 business day.
  3. Your complete kit ships in a carry case with the magnetic aluminum frame sections and folded tension fabric panels. Plan for at least 2 weeks between your order date and your show date on standard production.
  4. Every order includes a free digital proof before we print. If anything looks off, we adjust at no charge.

Production and Shipping Timeline

Production runs 3 to 5 business days. Rush production is available for tighter timelines. Your kit ships from our US facility in a carry case sized for the full 13 ft frame. Volume discounts apply to multi-booth orders and repeat graphic replacement orders.

Order at least 2 weeks before your show date for standard production, or contact us to add rush production for tighter timelines.

Talk to us about your show date

Our promise

100%

Nothing prints until you approve it.

You get a free digital proof first. If your order arrives damaged or off proof, we reprint it free. Checkout is secure and every order ships from the USA.

Reprint guaranteeDamaged or off-proof orders are reprinted at no costSee policy
Proof firstA free digital proof before production startsSee policy
Ships from the USANo overseas transit delays on domestic ordersSee policy
Secure paymentCheckout is secure and card data is never storedSee policy
Volume pricingMulti-booth and repeat orders qualify for volume ratesSee policy

If your order arrives damaged or doesn't match your approved proof, we reprint at no cost. That commitment covers every panel, front and back.

A2Z Printing Hub sends a free digital proof on every order before we print a single sheet. You'll see exactly how your graphics sit on each section of the S-curve. Checkout runs on encrypted payment processing, so your information stays secure. Every kit ships from our US facility, keeping lead times predictable and in your hands well before show day.

Care instructions

Product care

  • Spot clean the 240g tension fabric (a tightly woven flame-retardant polyester) with mild soap and water. Air dry the panels fully before folding. Do not machine wash this weight of fabric, as the heavier weave holds moisture longer than lighter display textiles and can develop mildew if stored damp.
  • Fold fabric panels flat and keep them in the included fabric bag between shows. Steam wrinkles before setup rather than ironing directly on the surface.
  • For the aluminum frame, wipe each section with a dry cloth after every show. Check each magnetic joint for grit or metal debris that could prevent a clean lock at your next event. Store the full kit in the carry case with joints free of small hardware.